Preliminary Planning for Mars Sample Return (MSR) Curation Activities in a Sample Receiving Facility (SRF)

Dec 14, 2021Astrobiology

Early Planning for Handling Mars Samples in a Receiving Facility

AI simplified

Abstract

The Sample Receiving Facility (SRF) will require a series of instruments to conduct initial sample characterization of Mars samples after their return to Earth.

  • Initial sample characterization is planned in three phases: Pre-Basic Characterization (Pre-BC), Basic Characterization (BC), and Preliminary Examination (PE).
  • A laboratory-based X-ray Computed Tomography scanner is identified as the least damaging option for penetrative 3D imaging before opening sample tubes.
  • Measurements before opening sample tubes are essential to inform how they are processed and subsampled.
  • The careful collection and storage of dust from the exterior of sample tubes is critical, as it represents a valuable resource for scientific study.
  • At least twelve pristine isolators will be necessary for Basic Characterization to minimize cross-contamination among the samples.

AI simplified

Full Text

what lands in your inbox each week:

  • 📚7 fresh studies
  • 📝plain-language summaries
  • direct links to original studies
  • 🏅top journal indicators
  • 📅weekly delivery
  • 🧘‍♂️always free